As CESC has undertaken maintenance works at Water Pumping Stations at Hongalli 2nd and 3rd stages and also at Belagola Pumping Station, power will be disrupted today between 10 am and 5.30 pm and hence, sufficient water cannot be pumped at these water pumping stations to be distributed to the following areas tomorrow (Mar.28): District Metered Areas (DMA) coming under MCC Ward Nos. 1 to 6, 20, 23, 38, 42 to 45 and 47. The areas are Hebbal, Kumbarakoppal, Manchegowdanakoppal, K.G. Koppal, Lokanayakanagar, Brindavan Layout, Vontikoppal, Paduvarahalli (Vinayakanagar), Mandi Mohalla, Lashkar Mohalla, Sharadadevi Nagar, Saraswathipuram, Bogadi, Vijayanagar 1st and 3rd stages, Gokulam 1st, 2nd and 3rd stages, RMP, BEML, Yadavagiri, Bannimantap A, B and C Layouts, Eeranagere, Siddiquenagar, Shivaratreeshwaranagar, Tilaknagar, Bademakhan, Haleemnagar, parts of Devaraja Mohalla, Nazarbad, Vidyaranyapuram, Krishnamurthypuram and other places, according to a press release from the Executive Engineer, VVWW Division, MCC, Mysuru.
This post was published on March 27, 2019 6:04 pm