An electric junction box installed on Manasara Road 6th Cross in Indiranagar is left with its underground electric cables exposed and the pit not covered properly. As rainy season has begun, rain water gets collected inside the pit which could pose danger. Authorities concerned are urged to take steps to cover the pit at the earliest for the safety of all.
This post was published on July 30, 2020 4:01 pm