Power supply will be disrupted from 10 am to 5 pm on May 13 in Siddiquinagar, Shivarathreeshwaranagar, Columbia Asia Hospital, Hanumanthanagar, HUDCO ‘C’ Layout, KSRTC Layout, Industrial ‘B’ Layout, Highway Circle, Cauverynagar and other places. There will be no power on May 14 from 10 am to 5 pm in Doora, Thallur, Murudagalli, Doddakatur, Chikkakatur, Sindhuvalli, Rajivnagar 1st, 2nd and 3rd Stages, Shantinagar, Nehrunagar, Bharatnagar, Radhakrishnanagar, JSS Layout, Shaktinagar, Ghousianagar, Kyathamaranahalli, Kalyanagiri, Hanchya, Bhugathahalli, Melapura, Rammanahalli, Kalasiddanahundi, Sathagalli, Bannur Ring Road, Meghalapura, Siddaramanahundi, MC Hundi, Uttanahalli, Kuppegala, Muddegowdanahundi, Ranganathapura, Srinivasapura, Devegowdanahundi, Varakodu, Hosahalli, Kupya and nearby places owing to maintenance works, according to a CESC press release.
Owing to major works in KPTCL transmission lines, power supply will be disrupted daily from 7 am to 9 pm from May 13 to May 27 in Bannur, Kirugavalu, Maliyuru, Chidravalli, Tumbla, Meghalapura, Maradihundi and Ayarahalli, the release said.
This post was published on May 12, 2019 7:10 pm