Mysore/Mysuru: As Chamundeshwari Electricity Supply Corporation (CESC) has taken up quarterly maintenance work at Hootagalli Power Receiving Centre, KV RK Nagar, Vijayanagar Power Distribution Centre and KHB Power Distribution Centre tomorrow (Sept.18), there will be no power supply from 9 am to 6 pm in the following areas in city:
Hootagalli Power Receiving Centre: Surrounding areas of Automotive Axle, Rane Madras road, Hootagalli Industrial Area, Old Lunars, Theorem, Spectra Pipes, Varsha Cable, L&T, Wipro, Sriram Engineers, Rajath Battery, Damden Apartment, Hinkal Ashraya Yojana and surrounding areas.
KV RK Nagar Power Distribution Centre: RK Nagar E and F Block, Vivekananda Circle, Nimishamba Layout, Madhuvana Layout, BEML Layout, Srirampura, Devayyanahundi, Preethi Layout, Saswathipuram, Gangothri, Kuvempunagar, Janathanagar, Sharadadevinagar, Aravindanagar, Chikkaharadanahalli, Kuvempunagar Complex, Akshay Bhandar, K.G. Koppal, DVG Layout, Gangothri Layout, Krishnamurthy Layout and surrounding areas.
Vijayanagar Power Distribution Centre: Gokulam 1st and 2nd Stages, Mahadeshwara Layout, Vijayanagar 1st and 2nd Stages, Hinkal, Yadavagiri, Manjunathapura, Mahajana Layout, Vontikoppal, Gokulam 3rd Stage, Jayalakshmipuram, CFTRI, DC’s House, Nurse Quarters, Akashavani, ESI Hospital, Hasu-karu Park, Gokulam Park, Kalidasa Road, Yadavagiri Industrial Area, Vijayanagar Water Tank, Adipampa Road, MMC Ladies Hostel, Gen. Thimayya Road, Brindavan Extension, Yoganarasimhaswamy Temple and surrounding areas.
KHB Power Distribution Centre: Vijayanagar 4th Stage, KHB Colony, Hootagalli, Belawadi, Basavanapura, Maratikyatanahalli, Panchacharya Layout, K. Hemmahahalli, Jattihundi, Lingadevarakoppal, Yelwal, KRS Road, Aditya Layout, SRS Colony, Koorgalli, NHB Colony, Belawadi Industrial areas, Hootagalli Industrial areas, Koorgalli Industrial areas, Grand Mourya Hotel, Yashaswini Choultry, Souparnika Apartment, Hinkal, SVEI College and surrounding areas, Jattihundi and surrounding areas, according to a press release from the CESC.
Jyothinagar, Power Distribution Centre – 10 am and 5 pm: Jalapuri, Gayathripuram, Jyothinagar, Udayagiri, Kyathamaranahalli, Shanthinagar 1st and 2nd Stages, Ganeshnagar, Sathyanagar, Mahadevapura road, German Press, Usmaina Block, Ghosianagar, Raghavendanagar, Giriyaboviyapalya, Yaraganahalli, Bannur road and surroun- ding areas.
Rajivnagar Power Distribution Centre: Rajivnagar 2nd and 3rd Stages, Christian Colony, Yasin Masjid, Suryanarayana Temple Road, Ambedkar Bhavan road, Narayana Hrudayalaya, Kamanakere Hundi, KHB Layout, RTO and surrounding areas.
Doora Power Distribution Centre: Doora, Talur, Murudagalli, Dodda Katur, Chikka Katur, Sinduvalli and surrounding villages, according to a press release from NR Mohalla CESC Executive Engineer.
This post was published on September 17, 2021 6:26 pm