Streets prepared for a grand Jumboo Savari 

Mysuru: With just three days remaining for the Mysuru Dasara  grand Jumboo Savari procession, preparations are underway in full swing across the Cultural Capital. 

The setting up of pandals along Albert Victor Road, from Chamaraja Circle to the Town Hall has started.  

Barricades to prevent people from coming on to Jumboo Savari route are being installed  at Chamaraja Circle, Albert Victor Road, K.R. Circle, Sayyaji Rao Road, Ayurveda Hospital Circle, Old RMC Circle, Bamboo Bazar Road, Highway Circle and Nelson Mandela Road.  

Barricades are also being installed on ‘Raja Marga’ to ensure safety and crowd control during the procession. 

This post was published on October 18, 2026 7:30 pm