Taking advantage of the rapidly depleting water level at the Krishna Raja Sagar (KRS) Dam, the State Government has launched a series of works to repair and rejuvenate the structure. Works are on to strengthen the walls, plugging leaks and cementing cracks.
KRS water level rises by 2 feet
February 28, 2017With the release of water from Hemavathi and Harangi reservoirs, the water level in KRS has risen by 2 feet. The water level in KRS dam which stood at 78.60 ft (maximum level 124.80 ft) on Saturday, touched 80.30 ft on Monday. The water level is expected to rise by one-and-half feet by today, as…
State plans to tap KRS Dam’s dead storage
February 23, 2017Anticipating drinking water crisis in Bengaluru this summer, the State Government is putting in place a contingency plan to draw water from the dead storage of Krishna Raja Sagar (KRS) reservoir at an estimated cost of Rs. 40 crore. A High-Level Meeting of Irrigation Officials on Feb. 21 discussed the possibility of pumping the dead…
Recent Comments