High-Level Reservoir Wall Demolished:  Yadavagiri residents raise hygiene and safety concerns
News

High-Level Reservoir Wall Demolished:  Yadavagiri residents raise hygiene and safety concerns

July 1, 2025

Mysuru: Residents of Yadavagiri have raised serious concerns over the prolonged delay in rebuilding the compound wall of the High-Level Reservoir (HLR), which was demolished several months ago during pipeline-laying works.

The wall facing Yadavagiri’s First Main Road was brought down as part of the Karnataka Urban Water Supply and Drainage Board’s (KUWS&DB) infrastructure upgrade. However, the failure to reconstruct it has created multiple civic issues, compromising the security of the HLR and the cleanliness of the area.

Locals report that the vacant space near the HLR is now being misused. Motorists frequently park their vehicles there and urinate near the reservoir, causing embarrassment to residents and creating hygiene concerns.

Additionally, plastic waste and garbage are regularly dumped in the area. The site has become a hotspot for drunkards and smokers, further deteriorating the surroundings.

The absence of proper maintenance has led to debris from the pipeline work being left uncleared, resulting in overgrown weeds and bushes. This unkempt environment has become a haven for poisonous reptiles and a breeding ground for mosquitoes.

Street dogs are also commonly seen loitering in groups around the site, drawn by the accumulated waste. Security, once ensured by the compound wall, is now completely absent. Moreover, the destruction of the footpath near the reservoir has significantly affected pedestrian movement, especially with the heavy traffic on both Yadavagiri First Main Road and Paramahamsa Road.

Frustrated by these mounting problems, residents have urged KUWS&DB to act swiftly. They have demanded immediate reconstruction of the compound wall and repairs to the damaged footpath.

READ ALSO  Covaxin maker has a deep connection with Mysuru

Responding to the concerns, KUWS&DB Executive Engineer Asif Iqbal Khaleel clarified that eight large pipes were installed during the recent pipeline works. He acknowledged that the wall collapsed due to water leakage from the existing pipeline system.

Khaleel assured that the Board is aware of the residents’ complaints and has no intention of inconveniencing the public. “The compound wall debris has already been cleared, and footpath repairs are underway,” he said, adding, “We are in discussions with the contractor and reconstruction of the wall will begin within two weeks.”

ABOUT

Mysuru’s favorite and largest circulated English evening daily has kept the citizens of Mysuru informed and entertained since 1978. Over the past 45 years, Star of Mysore has been the newspaper that Mysureans reach for every evening to know about the happenings in Mysuru city. The newspaper has feature rich articles and dedicated pages targeted at readers across the demographic spectrum of Mysuru city. With a readership of over 2,50,000 Star of Mysore has been the best connection between it’s readers and their leaders; between advertisers and customers; between Mysuru and Mysureans.

CONTACT

Academy News Papers Private Limited, Publishers, Star of Mysore & Mysuru Mithra, 15-C, Industrial ‘A’ Layout, Bannimantap, Mysuru-570015. Phone no. – 0821 249 6520

To advertise on Star of Mysore, email us at

Online Edition: [email protected]
Print Editon: [email protected]
For News/Press Release: [email protected]