Mysuru Railway Station expansion: 350 staff quarters likely to clear way
News, Top Stories

Mysuru Railway Station expansion: 350 staff quarters likely to clear way

May 8, 2022

Mysore/Mysuru: With the ambitious Naganahalli Satellite Terminal — at an estimated capital expenditure of Rs. 789 crore — becoming a quagmire over land acquisition and budgetary constraints, the South Western Railway (SWR) is looking at expanding the congested Mysuru City Railway Station and there is a proposal to utilise the space at present occupied by staff quarters.

These staff quarters have been built on the land owned by the Railways and if the proposal is accepted by the Railway Board, over 350 staff quarters beginning near the CFTRI Gate railway station entrance from Vani Vilas Water Works on KRS Road till the A. Ramanna Circle (Railway Colony) will be demolished. Before that, the 350 families that are presently living there will have to be relocated.

The Mysuru City Railway Station handles over 45 trains (to and fro) daily with over one lakh passengers and the vicinity is the busiest all the time with arrivals and departures from various sections including Bengaluru, Hassan-Sakleshpur, Nanjangud and Chamarajanagar. There are many outstation trains that reach destinations beyond Karnataka. In addition, goods wagons too pass through.

The expansion will enable the SWR to augment operations to and fro Mysuru that is at present handled by the City Railway Station and the Ashokapuram Railway Station. It will facilitate the introduction and operations of more trains and moreover it will provide the much needed space.

Expansion only in western side: The eastern part of the Station has no scope for expansion as there is the Station main building that is a heritage structure housing the offices of high-level officers and various other critical sections. Plus the parking lot is located on this side.

READ ALSO  Live screening at Mysuru City Railway Station

The only place where expansion can be taken up is the western part opposite the CFTRI gate near the Railway Museum. “The Station has reached its saturation point and there is a desperate need to expand. The Naganahalli Satellite Terminal project is stuck for more than three years now and there is a huge cost escalation in the originally planned Rs. 789 crore project. There is a plan or thought to demolish the staff quarters to make space for capacity building and expansion,” Divisional Railway Manager (DRM) Rahul Agarwal told Star of Mysore.

Almost all the residential quarters are over 95 years old and anyway they have to be demolished. “We are thinking of relocating the 350 families to other places where vertical residential complexes like the group housing project can be constructed. Land will not be an issue here as the Railways own many parcels of land in Mysuru.

Detailed Project Report

The SWR authorities have floated a Request For Proposal (RFP) to provide architectural and technical consultancy for a feasibility study. After the study, a Detailed Project Report (DPR) will be prepared for integrated redevelopment of the Railway Station and also to relocate the staff from the old quarters.

“All this is still in the planning state and the project has to gain approval from the Railway Board that will have a final say. The relocation of staff quarters just needs about 50 acres but if the existing quarters near the Railway Station are demolished, we will get over 165 acres,” the DRM added.

It may be recalled here that the SWR has taken up the upgradation of Belagola Railway Station, on the outskirts of the city in the Mysuru-Hassan-Arasikere Section with an estimated cost of Rs. 20 crore. Additional lines and a second platform are being constructed along with two stabling lines.

READ ALSO  From Mysuru to Mumbai: Railway Porter Badge No. 16 takes her to 'Indian Idol' stage

At present, the Belagola Railway Station has three stabling lines and two more will come up taking the total to five while the City Railway Station has six stabling lines.

4 COMMENTS ON THIS POST To “Mysuru Railway Station expansion: 350 staff quarters likely to clear way”

  1. Purushotham Gowda says:

    Next to Ashok Puram station many acres of Govt oil factory is available this could be transferred to Indian Railways and station can be expanded , Bengaluru trains can start from this station , Ashok Puram station can become like yeshwantpur station in Bengaluru. This will benefit Srirampura , Kuvemounagara , Jp Nagar residents very much .
    Mysore MP & MLA s should do this work , Govt oil factory should be alloted land in outskirts of Mysuru and factory machinary can be removed and assembled in new location.

  2. Questo says:

    Mysore is growing at an insane pace. Wait until the expected influx of Malayalees arrive, through Hassan-Kodagu-Kerala highway and Mysore airport expansion that will create opportunities for Malayalee crime bosses in the Gulf Countries to smuggle gold into the city, and to launder their illegal wealth. Al of this is the action of one villain-MP Simha.
    Wait until Greater Mysore is created-at this rate, Mysore will be nearly as big as Bangalore, and may even become the largest city in Karnataka, in a few decades, when businesses relocate to Mysore with the Airport receiving jet liners from the Middle East and creating air route to SE Asia like Bangkok and Singapore; unlike Bangalore, Mysore has space to expand laterally along Nanjangud-Wayanaad corridor and towards Nilgiris too, linking with Kerala and Tamil Nadu.,
    No wonders, Tamil Nadu government and Kerla government are encouraging Greater Mysore, expansion of Mysore airport, ther Highways, the fast trains to Chennai etc..
    Mysore then a heritage city? Not any more!!

  3. Questo says:

    Mysore is growing at an insane pace. Wait until the expected influx of Malayalees arrive, through Hassan-Kodagu-Kerala highway and Mysore airport expansion that will create opportunities for Malayalee crime bosses in the Gulf Countries to smuggle gold into the city, and to launder their illegal wealth. Al of this is the action of one villain-MP Simha.
    Wait until Greater Mysore is created-at this rate, Mysore will be nearly as big as Bangalore, and may even become the largest city in Karnataka, in a few decades, when businesses relocate to Mysore with the Airport receiving jet liners from the Middle East and creating air route to SE Asia like Bangkok and Singapore; unlike Bangalore, Mysore has space to expand laterally along Nanjangud-Wayanaad corridor and towards Nilgiris too, linking with Kerala and Tamil Nadu.,
    No wonders, Tamil Nadu government and Kerla government are encouraging Greater Mysore, expansion of Mysore airport, ther Highways, the fast trains to Chennai etc..
    Mysore then a heritage city? Not any more!!

  4. rajgopal says:

    welcome decision and also one flyover needed from there to city to minimise. brindavan exp should be extended from mysore minimise kaveri express stoppage and running hours.

ABOUT

Mysuru’s favorite and largest circulated English evening daily has kept the citizens of Mysuru informed and entertained since 1978. Over the past 45 years, Star of Mysore has been the newspaper that Mysureans reach for every evening to know about the happenings in Mysuru city. The newspaper has feature rich articles and dedicated pages targeted at readers across the demographic spectrum of Mysuru city. With a readership of over 2,50,000 Star of Mysore has been the best connection between it’s readers and their leaders; between advertisers and customers; between Mysuru and Mysureans.

CONTACT

Academy News Papers Private Limited, Publishers, Star of Mysore & Mysuru Mithra, 15-C, Industrial ‘A’ Layout, Bannimantap, Mysuru-570015. Phone no. – 0821 249 6520

To advertise on Star of Mysore, email us at

Online Edition: [email protected]
Print Editon: [email protected]
For News/Press Release: [email protected]